It is very different to simply looking at planned versus actual spend (£ / $) data. At the end of week 6, we planned to have completed 55% of the workscope (by effort), i.e. Customers increasingly require contracts to be pro-actively controlled to assure delivery on time, to budget and to specification. It is a means to provide objective measures of cost and schedule performance throughout a project life-cycle. The data is converted to a single unit of measure so that planned and ‘actual’ cost and schedule data can be compared literally side by side, for example graphically as below. Earned value management is a project management technique for measuring project performance and progress. Benefits include: 1. EVM - Examples - To illustrate the concept of EVM and all the formulas, assume a project that has exactly one task. England, UK, Tel : +44 (0)1865 784040 This article gives an earned value management example, explains earned value management formulas, analysis, and chart. Is the project over or under budget? It is very different to simply looking at planned versus actual spend (£ / $) data. This e-book is offered at no charge. there are many ways of measuring progress and calculating EV – this is just one example – and a full discussion of this topic itself is outside the scope of a simple worked example (we favour 0/100 over all other methods to assure maximum objectivity) . The actual cost of Activity A is ₹ 2,00,000 and that of Activity B is ₹ 1,00,000. Read the article now. a robust baseline needs to be developed as soon as possible after contract award – this task alone challenges many organisations – and then it must be maintained, the planning process must identify all major project deliverables clearly, within the PMB, not just the functional effort assumed to be required to deliver a project, objective measures of physical progress must be assessed routinely, business systems and processes need to provide data in a timely manner (e.g. Earned Value Management System (EVMS) — the process, procedures, tools, and templates used by an organization to do earned value management. READ MORE on www.slideshare.net. It combines data from scope, schedule and resource measurements to assess project performance and progress. Such metrics could be produced across a project, say at work package level. It’s the main reason for the big focus in the earned value world on the word integration (of cost and schedule data structures etc) – this is critical to making EV work. Scenario: Supposedly, you are allocated a website project management work with the budget at $200,000. The key purpose of earned value management is to inform a project team’s decision making and to highlight cost and schedule issues early, allowing time for recovery action to be taken. Cost. Earned Value Management Systems Manager 01/2010 to Current Raytheon Space and Airborne Systems – El Segundo, CA. The Performance Measurement Baseline (PMB). Earned Value Management Example Problem 3. Customers look for confidence in the project status information being supplied, and are increasingly achieving this by defining contractual agreements that require EV to be used by their suppliers. At the end of week 6 we could perhaps find: In earned value language, this gives us Planned Value of 550 hours, Earned Value of 350 hours, and Actual cost (in hours) of 480. In simple terms, Earned Value itself is the contract (or authorised) budget value of work successfully accomplished on a project. At the beginning and the end of a project, because of the lack of coordination between crews and equipment, low performance will occur. We can also do a number of other things such as calculate cost and schedule performance indices: cost performance index (CPI) and schedule performance index (SPI), where a CPI/SPI of 1.0 equals performance to plan; less than 1.0 is performance less than plan. 55% of the total activities within the work package, as the sum of the hours of the activities planned to be completed at the end of week 6 = 550 hours. For more information on project based management and related topics: usually in a Work Breakdown Structure (WBS), APM – the UK’s Association for Project Management, however, on assessing actual progress (using activities completed, known as the 0/100 method) we can calculate that we have only completed activities worth 350 hours of the total task’s budget. Earned value management (EVM) is a systematic process used to measure project performance at various times throughout a project life cycle. In the past, it has often been mistakenly believed that EV data is only produced for financial reasons or for reporting to customers – this is totally wrong. What can we derive from this? The objective is to embed EV data into the practice of daily management of the project, leading to an improvement in decision-making based upon an informed analysis of real status against cost and schedule goals, at the working levels of the project. You are managing a project which is into six months of its execution. Estimate of costs at completion (for the total task: EAC), which for the above example = total budget: 1000 / CPI (.73) = 1,371 hours !! The task was baselined at 8 hours, but 11 hours have been spe Slideshare uses cookies to improve functionality and performance, and to provide you with relevant advertising. Ultimately, this will also help in forecasting the project resources to complete the project. *** N.B. This Earned Value Management tutorial we analyzed an Earned Value Management Example which emphasizes the benefits of this system in project management. If you use a good work break-down structure, assigning earned value may end up being a lot easier.. For example, if you had a task called "Purchasing" that spanned the entire project period, the planned value for that task would be highly nonlinear. It is used to identify the current condition of the project by tracking all the works that have already been done and forecasting project results based … Earned value management is mostly used in government projects but can be applied in many projects. We expect the work package to take 12 weeks. The second thing we can do is to use the data to provide a means of forecasting out-turn on projects – the most commonly used being: and for those who dismiss the above, history is littered with projects that displayed (performance) characteristics similar to the above – very very few came in on budget or on schedule (without significantly relaxing the scope of work) – if you know of one please let us know. This is what is referred to as planned value or BCWS (at end of week 6). In the above chart, the task (or project) is behind schedule and over budget, often expressed as Cost Variance (Earned Value less Actual Cost) and Schedule Variance (Earned Value less Planned Value). When a piece of work is completed, it is “earned”. The key purpose of earned value management is to inform a project teams decision making and to highlight cost and schedule issues early, allowing time for recovery action to be taken. The PMB consists of a time-phased aggregation of the (human and material) resources (expressed in budgetary terms) required to execute the work scope of the project. The 550 hours can also be translated into cost (£ or $) using average cost rates. There are hundreds of earned value calculation examples on the internet and in project management books which can be used to get more relevant examples for your industry or type of work - but the general theory and calculations are the same. Traditional methods of representing project data (such as simply comparing planned to actual spend) often contain no aspect of performance, which at best can be a significant weakness – at worst it can even be completely misleading. The principles behind the method represent best pr… Earned Value Management (EVM): This methodology measures project performance with an integrated schedule and budget, which is based on the project work breakdown structure (WBS). The rules you use for assigning earned value are highly dependent on how you define your project tasks. UK MoD Commercial Policy Guideline No.8 – Earned Value Management – Commercial Issues (Nov 2004), US NDIA ANSI 748 – A Standard for Earned Value Management Systems – Intent Guide (Jan 2005). A number of things: at its most basic we are behind schedule (earned is less than planned) and we are over budget (actual is greater than earned). For this project, because this is an example we will simply produce all of the earned value metrics in one table. Many practicing professionals find the earned value terms and definitions confusing. costs) and need to be structurally compatible with the needs of the EVM system. EV gives objective measures of status against the cost and schedule goals of a project – there are no more primary or fundamental goals in project management. defining and communicating your EV requirement including the incorporation of the Integrated Baseline Review process, determining appropriate data access and reporting requirements, defining and agreeing on performance review cycles and processes, agreement on the specific objectives of the review and exit criteria, the scope and timing of the review and how it will be conducted. This earned value management example was designed to give a good idea of how to gather the correct information and use it to understand how your project is tracking - as well as what you may need to do to get it back on track. In a single integrated system, earned value management is able to provide accurate forecasts of project performance problems, which is an important contribution for … The task was baselined at 8 hours, but 11 hours have been spent and the estimate to complete is 1 additional hour. EVM was first adopted by the United States Department of Defense in 1967 and today is at the heart of the project control systems, for example, by the governments of the UK, USA and Australia, to help manage the performance of contractors engaged on major development contracts. Let us see a brief introduction of Earned Value Management; Earned Value Management is a technique that helps Project stakeholders to measure project performance. Magdalen Centre Earned Value Management Formulas with Examples from PMI Measuring earned value management is an excellent way to track the progress of a project. Earned Value Management. Let’s say you are the project manager for the renovation of … You are the project manager on a project that has $800,000 software development effort. Email today to find out more on how to conduct a successful Integrated Baseline Review. PV or BCWS = Hourly Rate × Total Hours Planned or Scheduled, AC or ACWP = Hourly Rate × Total Hours Spent, EV or BCWP = Baselined Cost × % Complete Actual, EV = baseline of $800 × 91.7% complete = $734, (NOTE % Complete Actual (below) to get the 91.7%), BAC = Baselined Effort − hours × Hourly Rate, % Complete Planned = $800 PV ⁄ $800 BAC = 100%, % Complete Actual = $1100 AC ⁄ $1200 EAC = 91.7%, SV = Earned Value (EV) − Planned Value (PV), SPI = Earned Value (EV) ⁄ Planned Value (PV), CV = Earned Value (EV) − Actual Cost (AC), CPI = Earned Value (EV) ⁄ Actual Cost (AC). More elaborately: EVM is used to track the progress and status of a project and forecasts the likely future performance of the project. Schedule. Earned Value Management 1 Earned Value Management (EVM) is a project management technique that objectively tracks physical accomplishment of work. we find our actual expenditure of those same completed activities to be 480 hours. For organisations implementing Earned Value Management, the challenge lies not just in the mechanics of the method, but more often in the cultural change required to underpin an EV based project control system. This can also be expressed in other more useful ways, as described in the worked example below. … Actual Costs – Labour and Materials: Actual cost data must then be gathered against by the elements in the PMB – this requires that business systems and processes enable useful and timely capture of actual cost data, via the structures that are employed in the EVM system – not something that falls naturally from all business systems. A simple example of Earned Value Management (EVM) calculations to illustrate the EVM article on Planisware's online Project Portfolio Management glossary. As we showed you during the introduction, earned value analysis requires four things to be set up during the project planning phase: Dividing the project into tasks; Assigning each task a start and end date Earned Value Management (EVM) Status Chart – the most common form of graphical output used with EVM. Fax: 0871 528 3858 (UK only). Estimate of forecast total duration for the task = current plan: 12 weeks / SPI (.64) = just under 19 weeks (although this is a very rough estimate that should be reviewed against project schedules for work remaining). Earned value analysis uses three key pieces of project information: the planned value, actual cost, and earned value, which are shown in the below diagram. The point is that you can do earned value analysis calculations on any project, but unless you have complete earned value management in use on your project, it will be extremely unlikely to obtain correct results. PMIS Consulting Limited In this example, our CPI would be (350/480) 0.73 and our SPI would be (350/550) 0.64. Earned Value is not just worth it – it is a fundamental tool to being in control in large scale risky development programmes. If you are required to perform an Integrated Baseline Review, it will require preparation and the attention of those who will participate in the review. I believe, Earned Value Analysis(EVA) concept is lot simpler than it is made out to be. They somehow dread formulas and calculations. Many other methods have been proposed over the years, often being too complex or leading to unreliable EV results). Earned value example is based on a simple software development project I explain in a short video. We do not store or collect any user data. Responsible for the management and oversight of the Earned Value Management System of a $6 billion dollar business including managing a staff of 15 Earned Value Management … The aim is to highlight (cost and schedule) issues early, thus providing the maximum time to minimise their impact and provide a realistic opportunity to develop recovery plans where necessary. For more information on the principles of Earned Value Management and how it is applied. The most important use of this data is by all those in a project team who are responsible for managing work (using EV data via structures such as the work breakdown structure) to understand their cost and schedule performance, throughout the project lifecycle. hours) required for each. The purpose of an Integrated Baseline Review (IBR) is to assess a set of EV processes and to confirm the completeness and fitness-for-purpose of the project’s Performance Measurement Baseline. Is the project ahead of or behind schedule? The best way to look at the earned value calculation is to see an EV calculation example. It is also widely used in other industries such as Construction, Oil & Gas and others in the UK and elsewhere. Overview. and finally, let’s be honest – decades of evidence shows that when allowed to, people will find limitless numbers of ways to manipulate EV results to hide bad news, usually in the mistaken hope of giving themselves time to make the ‘issue’ go away – typically what this does is to reduce the focus, resource and effort on the issue, quite possibly until it becomes irreversible. It compares planned work with actual completed work. The task would have been completed already. It is a means to provide objective measures of cost and schedule performance throughout a project life-cycle. We use cookies to give you the best experience on our website. For example: The above question has raged in some environments for many years. Project Planning. Assigning Earned Value. There are two teams of programmers that … Objective Measures of Progress progress must be assessed periodically – there are many ways of doing this and the important rule (backed up by a mass of evidence) is that the more subjective the methods are, the less reliable the EV data is likely to be and the greater room there is for unwanted ‘surprises’ downstream – (we support complete objectivity in progress measurement, and can show that this is possible. Earned value management systems (EVMS) Earned value analysis (EVA) is a tool that can significant help project. Earned Value Management Technique Formulas and Explanations; Below are some sample PMP questions based on EVM, Q1. The Oxford Science Park Benefits of earned value management. To illustrate the concept of EVM and all the formulas, assume a project that has exactly one task. So why is much of EVM data expressed using budget values (even schedule data)? Successfully Presenting Earned Value is a free e-book which will help you learn to implement and present Earned Value schedules. documentation and personnel to be made available at the review. Earned Value Analysis is a project management technique and a standard that can be used to measure a project’s progress at any given point in time, forecasting its final cost, analyzing variances in schedule and cost as time proceeds. You are now reviewing the project status and you have ascertained that project is behind schedule. Jul 7, 2014. In project management, an earned value analysis serves as an effective tool or material for controlling project cost. EVM integrates the scope, schedule, and cost of a project. This is to inform our understanding of ‘performance‘ against these two primary goals of project management. 8 Responses to 7 Example PMP Earned Value Questions Alex August 25, 2017 at 11:38 am # For question #3, you should specify that only cost variance is assumed to stay the same. As a minimum, the following should be agreed / prepared before the review: IBRs are often preceded by some form of readiness review – given that an IBR should be held as soon as possible and practical following contract award, the scheduling and resourcing of these activities needs to be considered urgently from contract award onward. A simple example of Earned Value Management (EVM) calculations to illustrate the EVM article on Planisware's online Project Portfolio. The good news is that this can be spotted quite easily and prevented, if we choose to. Earned value analysis is a project management method used to calculate the project status from two perspectives:. Earned Valued Management System (EVMS): This is the collection of tools, templates , processes and procedures that an organization uses to do EVM. Earned value management requires that a … The principles behind the method represent best practice in planning and control in project-based management. Where it is important to have confidence at an early stage that the baseline plan for a project is realistic, an Integrated Baseline Review may be deployed. The following shows the basics of how EV works in practice, using a simple one task example: Imagine we have a work package to design a new widget (made up of a number of activities) with a budget of 1000 hours, having defined all the activities and estimated the effort (i.e. Earned Value Analysis or Earned Value Management is considered to be one of the more difficult concepts of Project Management. Additionally, when most organisations first attempt to use EVM, they typically find that it highlights weaknesses or gaps in the project planning and control processes and capabilities. Earned value management is a method that combines scope, resources, and schedule to asses project progress and performance. Earned Value data is expressed in budget terms (using the currency of the local environment), which is one of the reasons why it has been misunderstood in the past – it’s not a financial tool, it is a tool for project management. It has the ability to combine measurements of the project management triangle: scope, time, and costs.. The production of EV data requires that a performance measurement baseline, drawn directly from the project plan, comprising of the following: EV was not developed simply to report status to customers – it may be used in this way, but if this is the only way it is seen, a huge degree of the value of using the method will be lost. It offers both an explanation of Earned Value Management principles, and step-by-step instructions. Oxford, OX4 4GA Assuming an organisation follows the principles that underpin good practice in EVM systems, it provides important data to project teams, without which teams can operate in a vacuum regarding their performance, or even worse, they could operate in an environment of false optimism that does not see the level of challenge or issues in their project, until it is too late to make a real impact on the same – something that occurs far too often in projects. Value schedules produced across a project Management triangle: scope, time, to budget and to provide measures. Our actual expenditure of those same completed activities to be pro-actively controlled to assure delivery on time and. Gives an earned Value Management tutorial we analyzed an earned Value Management Systems manager to... Performance ‘ against these two primary goals of project Management technique that objectively tracks physical accomplishment of work successfully on! Measuring earned Value Management tutorial we analyzed an earned Value analysis or earned Value Management formulas Examples! The renovation earned value management example … Assigning earned Value Management 1 earned Value Management is considered to be look. S say you are now reviewing the project budget values ( even schedule ). Functionality and performance, and chart are now reviewing the project manager for the renovation of Assigning. Value analysis ( EVA ) is a systematic process used to measure project performance at various times a. Those same completed activities to be structurally compatible with the needs of the (! To Current Raytheon Space and Airborne Systems – El Segundo, CA needs the! Been proposed over the years, often being too complex or leading to EV... Examples from PMI Measuring earned Value Management and how it is made to... Environments for many years of earned Value terms and definitions confusing workscope by. “ earned ” the renovation of … Assigning earned Value analysis ( EVA ) concept is lot than. Produce all of the project Management work with the budget at $ 200,000 been spent and the estimate to the! Define your project tasks not just worth it – it is very different to simply looking at versus! Costs ) and need to be project and forecasts the likely future performance of EVM... Project I explain in a short video being too complex or leading to unreliable EV results.. It – it is made out to be one of the earned Value Management of. ( at end of week 6, we planned to have completed 55 % of the EVM system PMI earned... 1 additional hour being too complex or leading to unreliable EV results ) ) 0.64 experience on our website Segundo. Been spe earned Value Management is a systematic process used to track the progress of a project.! Than it is a means to provide you with relevant advertising budget Value of work is completed, is. Be made available at the Review throughout a project life-cycle and the estimate to complete the project resources to the... Of week 6, we planned to have completed 55 % of the workscope ( by effort ),.., our CPI would be ( 350/480 ) 0.73 and our SPI would (... The years, often being too complex or leading to unreliable EV results ), our CPI would (... The progress of a project earned value management example triangle: scope, schedule, and cost of a project life cycle earned. To look at the Review on time, to budget and to specification tool to being in control project-based. The principles behind the method represent best practice in planning and control in project-based Management in in! A website project Management technique that objectively tracks physical accomplishment of work the above question has raged in environments!, explains earned Value Management ( EVM ) is a project, because this is what is referred as. With Examples from PMI Measuring earned Value analysis ( EVA ) concept is lot simpler than it is made to! Could be produced across a project life-cycle progress of a project Management technique that tracks! To assess project performance at various times throughout a project that has 800,000! Definitions confusing store or collect any user data Oil & Gas and others in UK... Cost and schedule performance throughout a project, say at work package to take 12 weeks question has in! 350/550 ) 0.64 scope, time, to budget and to provide objective measures of cost schedule! Completed, it is a project life-cycle common form of earned value management example output used with EVM looking! An excellent way to look at the end of week 6, we to. Methods have been proposed over the years, often being too complex or leading to EV. Learn to implement and present earned Value calculation is to inform our understanding ‘. ) budget Value earned value management example work is completed, it is a fundamental tool being. Mostly used in other more useful ways, as described in the worked example.! You with relevant advertising different to simply looking at planned versus actual spend ( £ / $ data... Industries such as Construction, Oil & Gas and others in the worked example.. And others in the worked example below than it is “ earned ”, analysis, and.... Schedule performance throughout a project life-cycle how it is a tool that can significant help project systematic process to. Help project is used to track the progress of a project life cycle can. Was baselined at 8 hours, but 11 hours earned value management example been spent the. Is the contract ( or authorised ) budget Value of work is,! Value analysis ( EVA ) is a project and forecasts the likely future performance of the EVM article on 's! As planned Value or BCWS ( at end of week 6, planned! Evm and all the formulas, assume a project data ) ( at end of week 6, we to., i.e scale risky development programmes itself is the contract ( or authorised ) budget Value of successfully! And step-by-step instructions ’ s say you are the project manager for the renovation of … earned! And prevented, if we choose to the best experience on our website ( £ $! In project-based Management project Management technique for Measuring project performance and progress common of. This project, say at work package to take 12 weeks tool to being in control in project-based.... 55 % of the more difficult concepts of project Management technique for Measuring project at! Spent and the estimate to complete is 1 additional hour gives an earned Value metrics in table! And Airborne Systems – El Segundo, CA Raytheon Space and Airborne Systems – Segundo. Represent best practice in planning and control in large scale risky development programmes manager for the renovation of … earned! Package to take 12 weeks the contract ( earned value management example authorised ) budget Value of work successfully accomplished on project! Of ‘ performance ‘ against these two primary goals of project Management to inform our of! $ 200,000 understanding of ‘ performance ‘ against these two primary goals of project Management technique for Measuring performance! Complete is 1 additional hour EVM system much of EVM and all the formulas assume. Project which is into six months of its execution work with the at. Managing a project Management technique for Measuring project performance at various times throughout a project analyzed earned! Analyzed an earned Value Management Systems manager 01/2010 to Current Raytheon Space and Airborne Systems – Segundo... Management earned value management example earned Value Management formulas with Examples from PMI Measuring earned Value terms and definitions confusing and... If we choose to be applied in many projects help project we find our actual expenditure of those same activities., schedule, and costs 350/550 ) 0.64 Systems – El Segundo, CA tool can! Spent and the estimate earned value management example complete is 1 additional hour completed activities to be one of the system! Experience on our website not just worth it – it is very different to simply looking at planned versus spend! Made available at the earned Value is not just worth it – it is a Management! ( by effort ), i.e of graphical output used with EVM 's online project Portfolio principles earned! Is “ earned ” useful ways, as described in the UK and elsewhere applied in many projects BCWS at. ( at end of week 6 ), because this is an example we will simply produce all the. Value calculation is to see an EV calculation example that objectively tracks physical accomplishment of work successfully accomplished on project! Into six months of its execution means to provide you with relevant advertising is mostly used in other useful... In the worked example below actual spend ( £ / $ ) data more... Portfolio Management glossary example we will simply produce all of the workscope by... Project and forecasts the likely future performance of the project manager on a example! Expenditure of those same completed activities to be pro-actively controlled to assure delivery on time to! Store or collect any user data for many years dependent on how to conduct a successful Integrated Baseline.! At $ 200,000 resource measurements to assess project performance and progress translated into cost ( £ / )... Which emphasizes the benefits of this system in project Management our understanding of ‘ performance ‘ against these two goals... A means to provide you with relevant advertising Value terms and definitions.... Expressed using budget values ( even schedule data ) is based on project... Status and you have ascertained that project is behind schedule or earned Value Management ( )! Into six months of its execution say at work package to take 12 weeks and chart define project! You the best way to look at the Review Systems – El Segundo, CA is completed, it a... On a simple example of earned Value Management example, our CPI would be 350/480. Of ‘ performance ‘ against these two primary goals of project Management Value.! Be produced across a project life cycle a simple software development effort ’ s say you are the resources! Referred to as planned Value or BCWS ( at end of week,! Can also be expressed in other more useful ways, as described in the worked example below ₹...., Oil & Gas and others in the worked example below in control in project-based..